
Site Evaluation
Our experienced team will visit your facility and conduct a brief walk through to evaluate the optimal positions for testing and installation of the FORCE energy saving system. Our team will discuss operational schedules and preferred times for installing our data logging equipment and FORCE system to minimize any interruption in the day to day operation.

Testing & Installation
After testing, our installation team will provide the necessary equipment to begin logging data for energy consumption levels and a power quality analysis. From this action we are able to identify the target areas for each site creating a customized solution. Our team retrieves data periodically and present the data to the client "on site" allowing the client to conduct an independent evaluation.